Warning: file_put_contents(./cache/4c61080077168cbe951e063abdfa94ca): failed to open stream: No such file or directory in /www/wwwroot/adama-bintu-ridgebacks.de/get_content.php on line 177
Renewables Readiness Assessment: Republic of Moldova - IRENA

Renewables Readiness Assessment: Republic of Moldova - IRENA

14 MW WNS condensing gas-fired boiler for university

14 MW WNS condensing gas-fired boiler for university

Output capacity: 14 MW, 6 tph
Equipment model: 3 sets of WNS14-1.0/115/70-Q, 2 sets of WNS6-1.0-Q

15 tph SZL series coal-fired steam boiler project for medical universities

15 tph SZL series coal-fired steam boiler project for medical universities

Output capacity: 15 tph
Equipment model: SZL15-1.25-All

8 tph coal-fired boiler project for feed industry in Pakistan

8 tph coal-fired boiler project for feed industry in Pakistan

Output capacity: 8 tph
Equipment model: SZL8-1.25-AⅡ

Need help? welcome to contact us

Our company can provide the whole spare parts of boiler equipment produced by us, with excellent features such as reliable performance characteristics, durable usage, all kinds of types in order to satisfy the requirement of customers in time and to reduce the maintenance time at the same time. Welcome to browse our website and leave us a message

Email allen@zozen.com

We will strictly protect the privacy of users'personal information and never disclose it.

Quick Way To Get Price

Need More Information About Our Products and Price?
Simply Contact Us, We Are Waiting for You!

  • Name
  • Phone or Whatsapp
  • Email*
  • Message

News Details

Renewables Readiness Assessment Republic of MoldovaThe Republic of Moldova has vast renewable energy potential that remains largely Renewables Readiness Assessment: Republic of Moldova identifies key to overcome a country&39;s barriers to renewable energy deployment, with IRENA Renewables Readiness Assessment: Republic of MoldovaCitation: IRENA (2019), Renewables Readiness Assessment: Republic of Moldova, International Renewable Energy Agency, Abu Dhabi. About IRENA.Renewable Readiness Assessment (RRA)It outlines a process designed for IRENA Member States to help them assess the status and prospects of renewable energy deployment at the national level, Renewables Readiness Assessment: MaliThe findings of the Renewable Energy Readiness Assessment (RRA) highlight major obstacles to the widespread deployment of renewable energy systems.

Republic of Moldova - International Renewable Energy AgencyRenewables Readiness Assessment Validation Workshop, Republic of Moldova. As part of the RRA Moldova process, a Validation Workshop was jointly 

RRA launch event Republic of Moldova - International Renewable 19 February 2019 |Chisinau, Republic of Moldova. On 19 February 2019 in Chisinau, IRENA, jointly with the Ministry of Economy and Infrastructure, launched the Read the report, Renewables Readiness Assessment Republic of Moldova.Renewables Readiness Assessment - Republic of Moldova | EU 28 Feb 2019 Renewables Readiness Assessment - Republic of Moldova Republic of Moldova is crying out for a more intensive use of renewable energy sources. of Moldova in pdf · https://www.irena.org/-/media/Files/IRENA/Agency/ 

10-point roadmap to renewable energy growth in the Republic of 25 Feb 2019 IRENA&39;s new Renewables Readiness Assessment (RRA): Republic of Moldova report developed in close cooperation with the Government of 

HOT PRODUCT

WNS series gas-fired (oil-fired) steam boiler

WNS series gas-fired (oil-fired) steam boiler

Processing capacity: 1-20 t/h
Working pressure: 0.7-2 Mpa

SZS series gas-fired (oil-fired) hot water boiler

SZS series gas-fired (oil-fired) hot water boiler

Processing capacity: 7-116 MW
Working pressure: 1.0-1.6 Mpa

WNS series gas-fired (oil-fired) hot water boiler

WNS series gas-fired (oil-fired) hot water boiler

Processing capacity: 0.7-14 MW
Working pressure: 0.7-1.25 Mpa

SZS series gas-fired (oil-fired) steam boiler

SZS series gas-fired (oil-fired) steam boiler

Processing capacity: 10-100 t/h
Working pressure: 2.5-9.8 Mpa

DZL series coal-fired steam boiler

DZL series coal-fired steam boiler

Processing capacity: 2 – 20t/h
Working pressure: 1.0-2.5 MPA

DHL series coal-fired steam boiler

DHL series coal-fired steam boiler

Processing capacity: 20-75 t/h
Working pressure: 1.25-5.4 MPA

SHX coal-fired CFB (circulating fluidized bed) steam boiler

SHX coal-fired CFB (circulating fluidized bed) steam boiler

Processing capacity: 10 - 75 t/h
Working pressure: 1.25-2.45MPA

DHX coal-fired CFB (circulating fluidized bed) steam boiler

DHX coal-fired CFB (circulating fluidized bed) steam boiler

Processing capacity: 35-75 t/h
Working pressure: 1.25-5.3 MPA